Construction Cost
10,200,000.00
Initial Schedule
7 months
Final Schedule
7 months
Key Personnel / Role
Frankie Bridgeman - Project Manager, Hayward Phillips - Project Superintendent
Owner / Contact Information
Mike Tippin - 385-5639
Design Engineer / Contact Information
Parsons Brinkerhoff - 466-1732
The project included the complete reconstruction of 8 city blocks of the Virginia Beach Oceanfront in a 6-month time frame. This is a project, most felt could not be accomplished. The project scope included demolition, Electrical Duct Bank, Verizon Duct Bank, Cox Cable Duct Bank, Water System, Sewer System, Curb, Sidewalk, Roadway, Asphalt, and Traffic control. The project was originally 8.8 Million and the City requested an additional 1.4 million work be accomplished in the same time frame due to the advanced schedule BCI was able to achieve.
The City of Virginia Beach Approached BCI about adding additional work they needed to perform in the following off season. We were ahead of schedule and agreed we could still meet schedule.
Owner / Project Manager
City of Virginia Beach
Status
Completed