Construction Cost
5,400,000.00
Initial Schedule
12 Months
Final Schedule
12 Months
Key Personnel / Role
Brian Williams - Project Manager
Owner / Contact Information
Lenny Mathews - 757-664-6735
Design Engineer / Contact Information
CDM Smith - CDM Smith
The Work under this project consists of replacement of an 8 million Gallon Water Tank with a 6 Million Gallon Tank. BCI came up with a Design Build which allowed the City to replace the existing water Tank while using the existing subgrade portion of the old tank as shoring. The project was negotiated with the owner for a completely new tank. Includes Auger Cast Piles, Concrete Slab, New steel Tank, Painting.
Owner / Project Manager
Norfolk Utilities Department
Status
Completed